Team members Goran, Josip and Tomislav have visited a group of three multi-purpose HPPs in the Drava basin (“Varaždin”, “Čakovec” and “Dubrava”) and combined-cycle (gas/steam) TPP “Jertovec” on the 20th December 2018. The hydropower plants are low-pressure, diversion type and with reservoirs for full daily and partial weekly regulation of inflow. All three power plants are controlled from one point, a Control Center situated in Varaždin, which was also part of the visit.
At HPP “Čakovec” dam
At the water supply channel of HPP “Čakovec”